What is the best time of year to renovate?
Optimal season: November–February — contractors have lower workloads, discounts of 10–20% are possible, easier to get specific start dates. Summer demand for contractors is at peak — waiting lists of 2–3 months. Nuances: in heat, paint and plaster dry unevenly (avoid 30°C+ indoors); in winter, ensure tile adhesive temperature stays above +5°C. Floor screed works best at 15–25°C. If you can leave the apartment: summer holidays (July–August) are good timing.