Why renovation often costs more than the first estimate
A budget overrun is usually not one big surprise. It is a chain of small missing decisions. The best protection is a clearer scope and a realistic contingency before work starts.
Hidden condition changes the scope
Old wiring, uneven floors, weak plaster, moisture and previous repairs can add preparation work before finishing even begins.
Material level changes mid-project
Switching tile size, paint class, fixtures or flooring after the estimate can change both material cost and labor time.
No contingency for small decisions
A 10-15% reserve is not pessimism. It keeps normal changes from turning into stress: extra leveling, delivery, accessories, small repairs.
Useful next steps
- Add 10-15% contingency
- Confirm material level early
- Photograph hidden problem areas
- Separate must-have and optional work
- Use one shared brief
Typical planning values
Reviewed: 2026-04-29
- Screed calculator: 1.6-2 kg/m2/mm · Reserve 5-10%
- Plaster calculator: 0.9-1.4 kg/m2/mm · Reserve 10-15%