How to inspect the quality of completed renovation work?
Key acceptance checks: 1) Walls — max 2 mm deviation per 2 m (use a straightedge); 2) Floors — tiles with no hollow spots (tap test), laminate with no squeaks; 3) Doors and windows — open and close smoothly; 4) Electrical — all outlets work, no sparking; 5) Plumbing — no leaks, normal water pressure. Require documentation for concealed work: acceptance acts for screeding and waterproofing. Photograph everything before final payment.